The Bridge Lake project is amazing and we have now moved on to the timber frame erection and house and shop framing stage. Tamlin sent our own timber installers to the site to erect the structure. This is the same crew that manufactured the timbers in our facility in Langley where they were milled, shaped, sanded, pre-stained and test fitted. The timbers should be completely installed within a few days. Along with the timber crew we have had in Bridge Lake for the past month, we recently sent another 4 team members up to assist. This cabin is constructing quickly with with a big crew working hard. If you have a project that you would like constructed quickly, where the high level of workmanship is very clear, call today to find out how to start the process. 604-856-1190