New, updated pictures from our Gambier Island Project. Here are some highlites:
Exterior Pre-finished Western Red Cedar “shadowline” paneling has been installed
Premanufactured, ready to assemble glulam post & beam structure,
Contemporary 14’ Window Views at Front
Open Living Concept with living , kitchen, and
All electrical, plumbing and HVAC Rough In completed,
And Drywall is scheduled in about a week.
We have already started on the kitchen manufacturing (off site), and appliances have all been chosen to
fit in perfectly with the design.
The clients visited the site last weekend and were thrilled at the progress and quality of construction.